Wilkes barre city

Road Work in Wilkes-Barre

March 06, 2019 - 7:52 pm

Beginning Thursday, March 7th the bridge over Solomon Creek, at the intersection of Waller Street and Brook Street, will be closed. Waller Street will be open to local traffic on either side of the bridge. Additionally, Brook Street from Vulcan Street to Waller Street will be closed.
The closure will allow repair work to be made. The work is projected to last 2 weeks.

Comments ()
Tags: